100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant

Product Details
Customization: Available
Type: Gravity Separator
Voltage: 380V
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Quality Assurance
The supplier provides quality assurance
to see all verified strength labels (21)
  • 100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
  • 100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
  • 100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
  • 100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
  • 100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
  • 100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
Find Similar Products

Basic Info.

Model NO.
diamond washing plant
Weight
2T
Material
Casting Steel
Material Feature
Heat Resistant
Certification
CE
Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Non-Customized
Condition
New
After-sales Service
Online Installtion Support
Product Name
Diamond Wash Plant
Feeding Size
50-100mm
Showroom
Nigria, Indonisia
Advantage
Free Design Flow Chart
Factory Visit
Welcomed Warmly
Transport Package
Standard Parts Packed in The Wooden Cases.
Specification
depend on the model
Trademark
Jxsc or OEM
Origin
Jiangxi, China
Production Capacity
10000 Pieces Per Year

Product Description

Product Description

100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant

Overview

Diamond wash plants, also known as diamond processing plants or diamond recovery plants, are specialized facilities designed for extracting and processing alluvial diamonds in rivers, beaches and diamond-rich deposits.

Diamond Mining Process

The diamond beneficiation production line is very similar to the sand gold production line. They usually consist of a washing machine plus a sorting machine. Ore washing equipment can be divided into trommel screen and rotary scrubber according to the different mud content. The separator usually uses a jig machine.

1. Washing and Screening Trommel scrubber and vibrating screen are used to remove impurities such as clay and mud, and the materials are graded at the same time.

2. Gravity separator Diamonds have a higher specific gravity than gangue and are suitable for separation with a jig separator. Diamonds settle to the bottom under the action of water flow and vibration, while lighter impurities float on the water surface and are discharged with the overflow.
100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant

Diamond Mining Process

3.Diamond recovery The heavy fraction containing the diamonds is further processed to recover the diamonds. Various methods can be employed, including X-ray sorting, grease tables, and hand sorting, depending on the size and quality of the diamonds.

4. Diamond rock crushing For some sandstone mixed ores and rock diamond ores, crushing is required before beneficiation. Jaw crusher is commonly used.

JXSC will customize suitable diamond processing plants for you based on detailed information. The production capacity can be based on requirements such as 10tph, 50tph, 100tph, 200tph, etc. It is also possible to design a one-stop diamond washing plant (jig concentrator + trommel screen/rotary scrubber).
100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant

 

Diamond Processing equipment
 
1. Trommel scrubber
Trommel scrubber is a good diamond mining equipment for diamond clay mine washing, The trommel is primarily used to remove water-soluble clays, deleterious materials and coatings providing a cleaner product. Our trommels washing screen are notable for its economy and efficiency, whether it is used in cleaning sand, gravel, or washing crushed stone and various ores.
 
2. Vibrating Screening
Vibrating Screening is another important part, it is used to separate material according to its size. Material is typically fed to a single-, double- or triple-deck screen to make the required sizes. The main water pipe of the vibrating screen adopts flange joint, which can easily connect the external water pipe with the machine. Through spray high-pressure water, it separates and washes material to obtain a good sieving effect.
 
3. Jig separator
Jig separator (jig concentrator, jig machine) is a mining gravity separation equipment that drives pulses of water upwards through
a thick bed of settled sediment to keep it loose and agitated. This achieves gravitational separation by allowing the denser
minerals to sink easily and quickly through the lighter minerals.
100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
Small diamond mobile wash plant

It is an Mobile Integrated machine with small-medium capacity 5-20tons per hour, which is quite suitable for
Gold/Diamond/Gemstone/Tin/Tungsten/Coltan separation & recovery.
100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
 100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
Successful cases
200TPH Diamond Processing Plant in Angola

Minerals: Clay diamond mine
Capacity: 200 tons per hour
Diamond Mining Equipment: First use vibration feeder to feeding material to trommel scrubber, After trommel scrubber for washing clean, and separator big size out, then to vibration screen. Vibration screen also for separator different size.
 
Diamond Mining and Processing: The capacity is for 200 tons per hour, First use backhoe get material to hopper, under hopper have a vibration feeder, vibration feeder can separator out +70mm size, then 0-70mm size to trommel scrubber, trommel scrubber is had two part, one part scrubber is for washing, one part screen is for separator different size. After trommel scrubber then to vibration screen, separator size again then can use jig machine get diamond.
 
This 200 tons per hours diamond separator line is have working for one year, and it has got good effect, for now, this customer want open another 200 tons per hours line, our engineer has to go mine site for inspecting, first can check the existing diamond processing plant, most things are good, but also some details can make more perfect, Our factory is a progress factory, we need to make the diamond process machine more and more perfect, besides checking the existing alluvial diamond mining equipment, also need to check the new diamond mining equipment, base the one new ore site, to choose the best diamond processing machine.
100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
 
100tph complete alluvial diamond wash plant

This setup is a 100tph complete alluvial diamond wash plant, the raw material is 0-250mm alluvial diamond ore with sticky clay, the diamond size is around 5-20mm. It is configured with vibrating feeder DN3896 with gap 75mm grizzly bar, one set swing feeder under the bin, JXSC-1500 trommel scrubber, one set single layer high-frequency vibration screen JXSC-1860, one set three layers high-frequency vibration screen JXSC-1860,3 sets jig separator, 6 sets belt conveyors.
 
 
(1) The truck unloads the 0-250mm diamond ore into the vibrating feeder; the +75mm scrap will be separated by the vibrating feeder grizzly bar and transferred by 1st conveyor to the first stockpile.
(2) The vibrating feeder feeds the -75mm ores evenly to the trommel scrubber to wash and separate by 5mm,20mm mesh. The 0-5mm material will be sent to the tailing pool by a trough. 5-20mm material will be sent to the first vibrating screen for further cleaning and dewatering, and 20-75mm material will be sent to the second stockpile by 2nd conveyor.
(3) The 5-20mm washed materials after washing and dewatering will be transferred to the storage bin equipped with one small feeder under the bin.
(4) The materials 5-20mm will be sent to the next high-frequency vibration screen. It will be separated into 3 size ranges: 0-10mm, 10-15mm 15-20mm. Each size will be equipped with one jig concentrator to concentrate.
 
100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
 
                                                    200TPH Diamond Washing Plant in Congo
 

Other Flowchart
Not only diamond ore, but our factory also can make gold ore machine line, chrome ore machine line, tin ore machine line, iron ore machine line, tantalum-niobium ores machine line, tungsten mining plant, Coltan mining plant, and so on, if you need more details pls contact us.
 
Diamond mining equipment for sale South Africa, JXSC has many successful cases in Africa, diamond mining in Africa
always has a good trend, we provide alluvial diamond mining equipment since 1985,have rich experience of DMS plant( dense media separation), diamond trommel. besides, we can do a diamond processing flowsheet design, mobile diamond washing plant, contact us to get the diamond mining process pdf and diamond processing flow chart.
100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant

Packing & Delivery
 
1. Some machines spare parts would be packed in wooden boxes to avoid broken. 
2. Usually the machines are fixed and loaded in container directly.


100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
 
Shipping
 
1. Usually our mining machines are shipped in 40'HQ or Flat Containers by sea. 
2. Our mining equipments can be also shipped by air if customers request. 
Our Company
100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant
 
Jiangxi Province County Mining Machinery Factory is a leading mining machinery manufacturer with over 30 years experiences,providing complete set processing equipments for Gold ore /Tin ore /Tungsten ore /Iron ore /Diamond/ Coltan ore /Silica sand /Zircon sand/ Black sand/Chrome ore/Cobalt ore/Antimony ore, ect. As well as complete set small laboratory mining machines.


Our Core Advantages as below :
1.+30 years history FACTORY at mining machinery
2.Provide engineer team after sales service
3.Provide Complete set mineral processing plant
4.Provide Sample testing service in factory lab for free
5.Provide professional Mining Solution Consulting 

Our Main product including: trommel screen, trommel scrubber, shaking table, spiral chute separator, jig machine, centrifugal concentrator, sluice box, vibration screen, melting furnace, jaw crusher, hammer crusher, ball mill, flotation machine, spiral classifier. as well complete set small laboratory mining equipments 

Our main market is in Africa, South Amercia, Europe , Southeast Asia, Asia,ect. Our cooperated customers cover Mali, Ghana, Sudan , Uganda, Mozambique, Suriname, Zambia, Nigeria, Cameroon, Madagascan, Malasia, Indonesia, Korea, Philippines, Monglia, Singapore, Inida, Iran, Mexico, Brazil, Chile, Peru, Spain, Canada, Austrilia,U.S, UAE,ect.
100 Tph Complete Diamond Washing Plant Mining Ore Dressing Washing Plant

 
FAQ
1.How is the quality of your products?(mining equipment/machine)
Answer: Our products are manufactured strictly according to national and international standard, and we will take a test on every grinder before delivery.



2.Guaranteed:
Answer: All of our products are guaranteed for one year. If products quality is not consistent with the description as we described or the promise before you place order, we promise 100% refund.

3.How about price?
Answer: For the complete same machine, we can promise our quality is the best when the price same as other competitors, and our price can be lowest when the quality at standard level.

4.Service and Payment Terms?
Answer: We can accept T/T and L/C; 30% deposit, 70% balance before delivery, which is international trade practice; Finished product pictures will provide to customers before delivery.

Our service

Pre-sales service: We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.

Sales service: Send technicians to the jobsite guiding the installation and adjustment, training operators and finishing the check and accept together with you.


After-sales service: To establish long term friendship, we will reg-ularly pay return visit to customers. Supplying technique, building design, instruction, installation and debugging for free.

Lifelong service: One year warranty to make sure your machine runs constantly.Always offer lifelong service and provide spare parts for a long term.

Very good service help us win many clients from all over the world.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier